TextAloud: ScanSoft Daniel22 Transmit a bit ,Proposal or quotation Lyrics

Transmit a bid , Proposal or quotation.

1.On March 26, 2002, your manufacturing division invited Doe Corporation to submit a proposal designed to address waste management problems at your Springfield facility.

Thanks for showing us the house at 1600 Main Street in Springfield last night. Although there are some obvious problems with the place, we believe that it would be adequate for our needs, and we would like to make an offer on it.

We appreciated your phone call on July 5, requesting a price quote on heavy equipment. We have compiled the figures you requested, and they are itemized below.

Thank you for allowing us to bid on the industrial equipment listed in your solicitation letter dated March 26, 2001.

In response to the public notice in the Springfield Herald, dated July 5, 2001, and the specifications outlined in the bidder's package, we would like to submit a bid for the Springfield Bridge on Main Street

2. We have completed our preliminary design studies and prepared the attached proposal.

We are pleased to submit the attached proposal outlining our solutions to your design problems.

Our bid for the total package is $4,500.00. Enclosed is a detailed list of required expenditures.

We can offer them $93,700.00 for the property.

Our design proposal is now ready, and we are submitting it for your consideration.

3. We prepared this proposal according to the design specifications you provided, but some of the lighting fixtures were not included.

Given the current shortage of some materials, it seems to us that your proposed deadline is unrealistic, so we have included an alternative completion schedule for your review.

We conducted our preliminary design studies and found some problems with the specifications you provided. We believe our design will accomplish the task more efficiently and at a significantly lower cost.

This bid is a direct response to the specifications you supplied, and we reserve the right to adjust our bid if you find it necessary to adjust your specifications.

With our new equipment we can complete the project is much less time than any local competitor.

If you have technical questions concerning our design, please contact John Doe, our chief engineer, at 555-5555.
4. If our proposal is acceptable, we are prepared to move ahead with the project immediately.

If you have any questions about this proposal, we will be happy to respond. Otherwise, we await your decision.

Because the market is volatile right now, this bid expires in two weeks, on March 15, 2002. Please inform us of your decision on or before that date.

Thanks again for asking Doe Construction to offer a bid on this project. We provide a high quality product backed by 32 years of building experience in the Springfield area.

If the bid is acceptable, please sign this letter, make a copy for your files, and return the original to me.

Please fax an acknowledgment that you have received this proposal in good order to 555-5555.

Letter #1:
Dear (name),

On behalf of Doe Company, I am pleased to present you with the enclosed proposal. I am certain you will find the information in line with your needs. The proposal covers the key points we discussed:

*(list points)

Doe Company is a full-service manufacturing company dedicated to quality products and superior customer service.

Thank you for the opportunity to serve you. We look forward to meeting with you again after you have reviewed the proposal,

Sincerely,

Letter #2:
This letter is in response to Doe Corporation's invitation for subcontractor bids on the projected south wing addition to Doe's corporate headquarters. Please find enclosed an itemized estimate of plumbing fixtures, pipes, miscellaneous supplies and labor to complete the job. As the estimate states, we will complete the project as specified for $23,460.

Because we are able to obtain our plumbing supplies wholesale, our bids of this magnitude are generally $2500 lower than our competitors'. Not only are our bids lower, but we pride ourselves on finishing our work on time. In the event that we fail to complete the plumbing by the designated date, we agree to pay the corporation $100 for every day we are past due.

Because we extend such an unusual offer to Doe Corporation, we expect a response within five days so we have time to make necessary preparations. Failing a response within that time, we revoke this written offer.

Letter #3:
Thank you for allowing me to examine your antique dining room set. You are correct in a__uming it needs extensive reconstruction, refinishing and upholstering. I am enclosing a detailed breakdown of my bid. Briefly, I can restore the table and chairs for $2500 and the hutch for $1500. Several of the chairs are badly split or broken and require extensive rebuilding. However, reconstruction is worth doing. Your lovely Victorian set could easily auction for $10,000 in mint condition. Please acknowledge confirmation of our bid as soon as possible. I am anticipating your response and am eager to start the project.

Letter #4:
In response to your request for proposal (RFP) for Springfield Bridge expansion, Doe Corporation submits the enclosed bid. We found numerous problems with the bid specifications and noted them in our proposal. Our proposal reflects the additional cost of dealing with those problems. We ask that you act on our bid no later than August 10, 2002, so that we can prioritize our summer work schedule.